Before… a 1959 bungalow in need of some updating.
The rear yard lacked easy flow from the kitchen…
… with little outdoor living space.
A new garage addition is planned…
… but first an armorstone retaining wall must be installed.
The garage foundation is poured.
The driveway is widened.
Foundation piers for a new cedar deck are poured.
Inside, demolition begins…
… with removal of existing basement stairs and several interior partitions.
A new structural I-beam is installed from front to back…
… and new openings created to the rear yard.
The new garage addition is framed…
… and doors and windows installed.
Matching brick is installed.
New patio doors and windows open up the magnificent view.
New wood-burning fireplace is installed.
New cedar deck is framed.
New kitchen with granite-topped island.
Marble and glass bath with ‘solar-tube’ for natural overhead light.
Retaining wall for the rear yard.
Forms are prepared for concrete patio.
Impressioned concrete sidewalks and patio.